Core tips:Izurdi,The bearing capacity of each load is different. Generally, while oil transformer has better load working capacity.Due to

The bearing capacity of each load is different. Generally, while oil transformer has better load working capacity.

Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.

IzurdiTransformer inspection ear

The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.

ChashnikiPerformance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank,IzurdiTransformer energy, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion general installation process, machinery and equipment of each process flow; The natural working environment is basically regulated.

The main reason is that the welding quality of electric welding is poor leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, there are empty welding, open welding, needle holes,IzurdiDry type 1250kva transformer, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

The power transformer belongs to relatively durable electrical equipment and we can"t neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:


IzurdiThree phase transformer 480v to 380VFocus on going international



What is the wavelength of oil immersed transformer?

The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.

assetsThe first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation the good model is the solid model of infinite transformer core column, but there are many calculation methods.

Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.


IzurdiThree phase transformer 480v to 380VFocus on going international



When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.

production costs(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

Transformer manufacturers generally adopt IP protective casing, which can avoid the entry of solid dirt with a diameter of more than mm, rats, snakes, cats, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors, IP protective casing can be adopted, which can avoid being equally divided with the above IP protective effects However, IP casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.

The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the closing frequency shall be times, the delay time after power receiving shall not be less than min, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified,IzurdiBasket electric box transformer, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

For no-load impulse closing of transformer, pay attention to the following matters:

(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.

Copyright and notice:
1. The IzurdiThree phase transformer 480v to 380VFocus on going international displayed by English e-commerce news network is published by the user. Netizens are welcome to reprint it, but the reprint must indicate the current web page address or web link address and its source.
2. This page is IzurdiThree phase transformer 480v to 380VFocus on going international information, and the content is published and uploaded by users. This website is not responsible for the authenticity, accuracy and intellectual property rights of the content of this page (including but not limited to text, pictures, videos). This page is public welfare information. If you find that the content of IzurdiThree phase transformer 480v to 380VFocus on going international is illegal or illegal, please contact us, we will delete or change it as soon as possible, thank you for your cooperation
3. Part of the content posted by users on this website is reprinted from other media for the purpose of conveying more information. It does not mean that this website agrees with their views or confirms the authenticity of their IzurdiThree phase transformer 480v to 380VFocus on going international. The content is for entertainment reference only. This website does not bear the direct and joint liability for the infringement of such works, hereby declare!
More>similarNews

recommendNews
Latest News