ZamoshikElectric self-propelled elevatorDo you know the weight calculation method

  • release time:2024-05-06 17:52:41
  • Key words:

  • Pageviews:123
  • Quick description:

    Zamoshik,Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bea

Article content

Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).

Setting requirements: For construction electric elevators that operate in multiple shifts, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

ZamoshikSteel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professional

Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).

Black spotThe verticality of the guide rail frame should meet the requirements of the specifications.

Double layer steel mesh: The diameter of the steel bars is mm,ZamoshikSmall hydraulic electric elevator, with a spacing of mm.

Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed,ZamoshikThree wheel electric elevator, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.


ZamoshikElectric self-propelled elevatorDo you know the weight calculation method



After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

The shutdown device (emergency stop switch) should be non automatic reset type.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of meters by meters.

device managementBefore installation, the installation unit should confirm that the foundation, foundation bearing capacity embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form,ZamoshikElectric elevator factory, concealed engineering acceptance form, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.


ZamoshikElectric self-propelled elevatorDo you know the weight calculation method



The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, smooth lifting and low noise.

queryConstruction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Setting requirements: The up travel (limit) switch should be able to automatically stop the cage running at the rated speed before reaching the upper limit switch, but should not trigger the up travel (limit) switch as high

The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology smooth lifting and low noise.

ZamoshikWhen the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

The verticality of the guide rail frame should meet the requirements of the specifications.

When the landing door is closed, the full width of the lifting passage opening should be covered.


Other product information
  • LimerickPrice of guide rail type lifting platformRadial processing method

    LimerickPrice of guide rail type lifting platformRadial processing method

  • JinchengRear flip hydraulic plate flipperAnalysis of the length measurement method

    JinchengRear flip hydraulic plate flipperAnalysis of the length measurement method

  • LiegeHotel small elevatorOperation and use specification

    LiegeHotel small elevatorOperation and use specification

  • AnthonyScissor fork hydraulic lifting platformHow about it

    AnthonyScissor fork hydraulic lifting platformHow about it

  • Burgess gradbachLifting platform lifting hydraulic pressureAll indicators reach the advanced level o

    Burgess gradbachLifting platform lifting hydraulic pressureAll indicators reach the advanced level o

  • SichuanLifting table hydraulic systemThe stability is affected by the slide rail

    SichuanLifting table hydraulic systemThe stability is affected by the slide rail

  • EggerHydraulic lifting platformMarket demand is increasing

    EggerHydraulic lifting platformMarket demand is increasing

  • EggerHigh precision hydraulic lifting platformThe market is mostly in a state of stabilizing prices

    EggerHigh precision hydraulic lifting platformThe market is mostly in a state of stabilizing prices

  • prompt:Reminder: ZamoshikElectric self-propelled elevatorDo you know the weight calculation method information provides you with ZamoshikElectric self-propelled elevatorDo you know the weight calculation method by our company, ZamoshikElectric self-propelled elevatorDo you know the weight calculation method service and other information. If you purchase ZamoshikElectric self-propelled elevatorDo you know the weight calculation method products, please confirm, open the company account, and sign the ZamoshikElectric self-propelled elevatorDo you know the weight calculation method agreement. The above ZamoshikElectric self-propelled elevatorDo you know the weight calculation method is a commercial trade activity. The information displayed above is provided by the seller, and the authenticity, accuracy and legality of the content is the responsibility of the publishing seller. Please be aware that the risks in Internet transactions are objective. We hope that everyone will cooperate in good faith, win-win cooperation, and maintain a harmonious, law-abiding and pure network environment. If you find any false information in ZamoshikElectric self-propelled elevatorDo you know the weight calculation method, or the information infringes your legal rights, we will actively cooperate and deal with it seriously and delete the information in time , Hereby declare!